The hydrants, water and sewer lines have been connected to the existing systems. Directional drilling under Highway 28 was successful and the lines have been fused together. In the Spring, the dirt work will commence.

The new coring machine did an excellent job of boring through concrete, allowing us to tie the water and sewer lines to the existing cisterns.